PT. Gemilang Thermal Engineering

Logo GTE
Projects

Milestone

This important achievement is the point where Gemilang Thermal started commercially or gained recognition and enrich the understanding and mastery of products services and services offered.

Electrical Work, Jack Up Rig, L210

Year : 2011

Client : PT. Drydock Paxocean, Graha Trisaka Industry

Location : Batam

EPC HVAC 2 x 30MW Coal Fire Plant

Year : 2011

Client : PT. Punj Llyod Indonesia

Location : Tanjung Tabalong, South Kalimantan

Piping Insulation Evonik Me 5 Pipe rack

Year : 2013

Client : OGSP Engineering Pte. Ltd

Location : Batam

EPC Cargo Fish Hold Architectural, T214

Year : 2013

Client : PT. Drydock Paxocean

Location : Batam

EPC HVAC System 3 x 18MW CFPP Tanjung Bara

Year : 2014

Client : PT. Citra Kusuma Perdana

Location : Sangatta, Kalimantan Timur

Piping Insulation Alwasit Project

Year : 2014

Client : PT. Saipem Indonesia

Location : Tanjung Balai Karimun

Supply Material & Service Painting of Rusted structural on 3x18MW Power Plant

Year : 2018

Client : PT. Kaltim Prima Coal

Location : Sangatta, Kalimantan Timur

Supply and Install Inject Tank with Polyurathane

Year : 2018

Client : PT. Drydock Paxocean, Graha Trisaka Industry

Location : Batam

Supply Material & Service Painting of Rusted structural on 3x18MW Power Plant

Year : 2019

Client : PT. Kaltim Prima Coal

Location : Sangatta, Kalimantan Timur

HVAC 2 x Kapal Perintis Dirjen Perhubungan Laut

Year : 2019

Client : PT. Drydock Paxocean, Graha Trisaka Industry

Location : Batam

Project Experience

Gemilang Thermal have experience to supply as well as contractor and also end user across many location in Indonesia.

Ship Repair for HVAC, Architectural, Carpenter

Year : 2016 ~ Present

Client : PT. Drydock Paxocean

Location : Batam

Tank Insulation

Year : 2020 – Now

Client : PT. Cosmic Indonesia

Location : Batam

HVAC Work Canada Project

Year : 2020 – Now

Client : PT. Wasco Engineering Indonesia

Location : Batam

Painting of structural 3x18MW Power Plant

Year : 2019

Client : PT. Kaltim Prima Coal

Location : Sangatta, Kalimantan Timur

HVAC & Pipe Insulation for 3 unit Harbour Tug

Year : 2019

Client : PT. Drydock Paxocean

Location : Batam

Painting of structural 3x18MW Power Plant

Year : 2017

Client : PT. Kaltim Prima Coal

Location : Sangatta, Kalimantan Timur

Supply & Install Fiber Resin for Olympus 1 Vessel

Year : 2016

Client : PT. Drydock Paxocean

Location : Batam

Piping Insulation Alwasit Project

Year : 2014

Client : PT. Saipem Indonesia

Location : Tanjung Balai Karimun

EPC HVAC System 3 x 18MW CFPP Tanjung Bara

Year : 2014

Client : PT. Citra Kusuma Perdana

Location : Sangatta, Kalimantan Timur

Insulation Work H7074 & H7075 Ship

Year : 2014

Client : PT Batamec Shipyard

Location : Batam

Piping Insulation Evonik Me 5 Pipe rack

Year : 2013

Client : OGSP Engineering Pte. Ltd

Location : Batam

EPC Cargo Fish Hold Architectural, T214

Year : 2013

Client : PT. Drydock Paxocean

Location : Batam

EPC Provision Room & SS Furniture, T214

Year : 2013

Client : PT. Drydock Paxocean

Location : Batam

Supply & Inject Tank With Polyurethane, T214

Year : 2013

Client : PT. Drydock Paxocean

Location : Batam

EPC HVAC 2 x 30MW CFPP

Year : 2011

Client : PT. Punj Llyod Indonesia

Location : Tanjung Tabalong, Kalsel

Electrical Work, Jack Up Rig, L210

Year : 2011

Client : PT. Drydock Paxocean

Location : Batam

Our Partner