Electrical Work, Jack Up Rig, L210
Year : 2011
Client : PT. Drydock Paxocean, Graha Trisaka Industry
Location : Batam
EPC HVAC 2 x 30MW Coal Fire Plant
Year : 2011
Client : PT. Punj Llyod Indonesia
Location : Tanjung Tabalong, South Kalimantan
Piping Insulation Evonik Me 5 Pipe rack
Year : 2013
Client : OGSP Engineering Pte. Ltd
Location : Batam
EPC Cargo Fish Hold Architectural, T214
Year : 2013
Client : PT. Drydock Paxocean
Location : Batam
EPC HVAC System 3 x 18MW CFPP Tanjung Bara
Year : 2014
Client : PT. Citra Kusuma Perdana
Location : Sangatta, Kalimantan Timur
Piping Insulation Alwasit Project
Year : 2014
Client : PT. Saipem Indonesia
Location : Tanjung Balai Karimun
Supply Material & Service Painting of Rusted structural on 3x18MW Power Plant
Year : 2018
Client : PT. Kaltim Prima Coal
Location : Sangatta, Kalimantan Timur
Supply and Install Inject Tank with Polyurathane
Year : 2018
Client : PT. Drydock Paxocean, Graha Trisaka Industry
Location : Batam
Supply Material & Service Painting of Rusted structural on 3x18MW Power Plant
Year : 2019
Client : PT. Kaltim Prima Coal
Location : Sangatta, Kalimantan Timur
HVAC 2 x Kapal Perintis Dirjen Perhubungan Laut
Year : 2019
Client : PT. Drydock Paxocean, Graha Trisaka Industry
Location : Batam
Project Experience
Gemilang Thermal have experience to supply as well as contractor and also end user across many location in Indonesia.
Ship Repair for HVAC, Architectural, Carpenter
Year : 2016 ~ Present
Client : PT. Drydock Paxocean
Location : Batam
Tank Insulation
Year : 2020 – Now
Client : PT. Cosmic Indonesia
Location : Batam
HVAC Work Canada Project
Year : 2020 – Now
Client : PT. Wasco Engineering Indonesia
Location : Batam
Painting of structural 3x18MW Power Plant
Year : 2019
Client : PT. Kaltim Prima Coal
Location : Sangatta, Kalimantan Timur
HVAC & Pipe Insulation for 3 unit Harbour Tug
Year : 2019
Client : PT. Drydock Paxocean
Location : Batam
Painting of structural 3x18MW Power Plant
Year : 2017
Client : PT. Kaltim Prima Coal
Location : Sangatta, Kalimantan Timur
Supply & Install Fiber Resin for Olympus 1 Vessel
Year : 2016
Client : PT. Drydock Paxocean
Location : Batam
Piping Insulation Alwasit Project
Year : 2014
Client : PT. Saipem Indonesia
Location : Tanjung Balai Karimun
EPC HVAC System 3 x 18MW CFPP Tanjung Bara
Year : 2014
Client : PT. Citra Kusuma Perdana
Location : Sangatta, Kalimantan Timur
Insulation Work H7074 & H7075 Ship
Year : 2014
Client : PT Batamec Shipyard
Location : Batam
Piping Insulation Evonik Me 5 Pipe rack
Year : 2013
Client : OGSP Engineering Pte. Ltd
Location : Batam
EPC Cargo Fish Hold Architectural, T214
Year : 2013
Client : PT. Drydock Paxocean
Location : Batam
EPC Provision Room & SS Furniture, T214
Year : 2013
Client : PT. Drydock Paxocean
Location : Batam
Supply & Inject Tank With Polyurethane, T214
Year : 2013
Client : PT. Drydock Paxocean
Location : Batam
EPC HVAC 2 x 30MW CFPP
Year : 2011
Client : PT. Punj Llyod Indonesia
Location : Tanjung Tabalong, Kalsel
Electrical Work, Jack Up Rig, L210
Year : 2011
Client : PT. Drydock Paxocean
Location : Batam